WELCOME TO FOUNTAIN STREETS DEPARTMENT
The Streets Division is currently staffed with one full-time Superintendent, one Crew Foreman, seven full-time Maintenance Workers. The Division currently maintains over 105 miles of roads, seven bridges, five traffic signals, two traffic calming speed limit signs, nine lighted school pedestrian crossings, 645 storm drainage inlets, 194 drainage culverts, 173 manholes, several drainage detention ponds, several miles of storm drain pipes and 273 drainage outfall structures.
The Street & Drainage Division performs the following major responsibilities:
- Snow Removal & Ice Control
- Street Paving, Patching and Crack Sealing
- Grading - Gravel Roads, Alley ways
- Street Signs, Traffic Signs and Traffic Signals
- Traffic Control - Parades, Emergencies
- Storm Drainage - Curbs, Culverts, Storm Drains, City owned Detention Areas
- Mitigation - Mowing & Weed Control in Street/Drainage Right of way, Detention Ponds, Tree Trimming
- Community Special Events including Dumpster Days, Senior Citizen Curbside Service, Labor Day Parade, Thunder in the Valley.
TO REPORT A POT HOLE OR OTHER STREET RELATED ISSUE
CLICK HERE